Hotel procurement is not furniture shopping at a larger size. It is a schedule: every item tied to a room type, a handover date and a fire-regulation standard, with a dozen factories feeding one container. We act as your buying office in China for this — reading the BOQ, shortlisting contract-capable factories, arranging samples, and inspecting before anything is loaded.

BOQ & Drawing LedContract-Grade SpecRoom-Packed & Labelled
06
What we source in this category

Six areas
a typical fit-out covers.

Most projects touch all six. The value of buying them together is that one consolidation warehouse and one inspection covers the whole schedule.

01

Guest Room Casegoods & Seating

Beds, headboards, nightstands, desks, wardrobes, luggage benches and armchairs built to contract durability standards.

02

Lobby & Public Area

Reception desks, lounge seating, console tables, feature pieces and planters for lobbies and circulation spaces.

03

Restaurant & Bar

Dining tables and chairs, bar stools, banquette seating, host stands and service stations built for commercial use.

04

Soft Furnishings & Bedding

Curtains, blackout linings, cushions, throws, rugs, mattresses, protectors, linen and towelling at specified counts.

05

Lighting & Decorative

Bedside and desk lamps, pendants, wall sconces, mirrors and artwork, specified to the project's electrical standard.

06

Banquet & Meeting

Stacking banquet chairs, folding tables, stage and podium pieces and storage built for high-turnover function rooms.

Materials and construction

What it is specified in
and why it matters.

Contract specification exists because hotel furniture is used ten times harder than domestic furniture and is regulated more tightly. These are the lines that get written into a BOQ.

01

Contract-grade frames

Kiln-dried hardwood or reinforced engineered frames with screwed and glued joints rather than staples. Built for a commercial warranty, not a living room.

↗
02

Commercial upholstery

Contract fabrics rated at 40,000 Martindale rubs or more, with foam density specified for the seat, not just the look.

↗
03

Fire-retardant treatment

BS 5852 Crib 5 or CAL 117 depending on your market, applied to foam, fabric and filling. Ask for the certificate by item, not by supplier.

↗
04

Casegoods surfaces

High-pressure laminate, veneer or lacquer on engineered board, specified for wear, cleanability and replacement cycles.

↗
05

Metal & stone

Powder-coated steel and aluminium, stainless, marble and sintered stone for reception desks and high-traffic public areas.

↗
06

Bedding & towelling

Thread count, GSM and fibre content specified per item, with commercial laundering durability in mind rather than retail softness.

↗
What to expect when buying

What a project order
usually looks like.

Project procurement runs on a schedule rather than a product link. These are the ranges that shape the plan.

Typical MOQProcured against room count. Custom contract pieces generally begin at ten to thirty rooms per item, with stocked items available in smaller numbers.Indicative
Lead timeSixty to one hundred and twenty days from approved drawings to container loading, depending on how much is bespoke and how many factories are involved.Plan early
SamplingA mock-up room or a set of material samples is standard before bulk production. It is the single cheapest way to avoid a container of the wrong thing.Recommended
PackagingRoom-packed and labelled by room type and floor, so installation crews unpack in sequence instead of sorting on site.Ask upfront
ComplianceBS 5852 Crib 5 or CAL 117 fire retardancy, EN standards for contract seating, and electrical certification on all installed lighting.Essential

On a project, the schedule is the deliverable. We quote dates alongside prices, and we flag slippage as soon as a factory shows it.

Before you send the enquiry

Six things worth
deciding before you ask.

A BOQ is enough to start. These six answers turn it into a schedule we can hold a factory to.

Room types and counts, with the item list per room type
Handover date, and whether installation is phased by floor or by wing
Fire-retardancy standard for your market, stated per item category
Which items are bespoke to a drawing and which can be bought from stock
Whether a mock-up room or material sample approval is required before bulk
Consolidation and shipping plan: one container, part load, or staged deliveries

Send the BOQ even if it is unfinished. We will tell you which lines are straightforward and which will drive the schedule.

Factory-by-factory vs. one buying office

What changes
when one party owns the schedule.

A fit-out involves more factories than any buyer wants to manage individually. The risk is not price, it is timing and mismatch.

On your own

Managing it yourself

  • A dozen factories on a dozen schedules, each with its own slippage
  • Fire certificates collected item by item, often late
  • Colour and finish matched across factories by photograph
  • Separate shipments, so a room cannot be installed until all arrive
  • Balance paid before anything has been inspected
Through OZ

Buying through OZ

  • One schedule owned by one party, with slippage flagged early
  • Fire and compliance documents collected per item before loading
  • A sealed approved sample or mock-up room as the reference standard
  • Everything consolidated, room-packed and labelled for installation
  • Pre-shipment AQL inspection with photos before the balance is released
Common questions

Before you send
the first BOQ.

These are the questions project buyers ask before handing over drawings.

Can you pack and label by room?

Yes, and on a fit-out it is worth insisting on. We pack by room type and label by room and floor, so the installation crew unpacks in sequence instead of sorting a container on site. It costs a little more in the warehouse and saves considerably more in labour and delay at the other end.

How long does a hotel fit-out take to procure?

Sixty to one hundred and twenty days from approved drawings to container loading is typical, depending on how much is bespoke. Custom casegoods and upholstery drive the schedule; stocked items are much faster. We give you dated milestones at the start and flag any factory slippage as soon as it appears, not at the end.

Can you build a mock-up room first?

Yes, and we recommend it for anything bespoke. A mock-up room, or a full set of material and finish samples if a room is impractical, settles comfort, colour and build quality before a container is committed. It is the cheapest insurance available on a project of this size.

Will you work from our designer's drawings and BOQ?

Yes. We work from the designer's drawings, BOQ, FF&E schedule or reference images, and we will tell you where a specified item is difficult to source or better quoted elsewhere. We are also used to working under NDA, and will sign before any drawing is opened.

Start with the requirement

Have a Hotel FF&E brief?
Let’s price it.

Send the BOQ, drawings or room schedule. We will tell you what is straightforward, what will drive the dates, and where the risks sit.